Chester Conservatory Build Process

1. The site of the proposed conservatory.

2. Construction work begins. The trench is excavated to suit the relevant ground conditions, in this case, to a depth of 450mm (minimum depth) for the footings. The general ground level (within the area of the trench) is also reduced to a minimum of 300 mm below the DPC. Excavation exposes an underground pipe.

3. Concrete lintels should be placed to bridge the underground drainage pipe to prevent the pipe being crushed. Also additional steel reinforcement mesh introduced to the concrete foundation will provide additional support.

4. Stakes driven into the ground are set 450mm below DPC (Damp Proof Course) and 300mm below outside ground level. Concrete is then poured into the 450mm deep trench to a depth of 150mm.

5. The concrete is floated to form a level surface 450mm below the house DPC

6. The inner leaf of the cavity wall is built up to floor level, usually the house DPC.

7. Hardcore is laid to a minimum 100mm deep and compacted to form the base layer of the slab.

8. A blinding screed of sand 50mm thick is laid over the compacted hardcore layer to prevent any sharp stones puncturing the damp proof membrane (heavy duty plastic sheeting).

9. The damp proof membrane is laid over the sand blinding and lapped onto the inner leaf of brickwork

10. Optional floor insulation (50mm thick Styrofoam in this case) is placed upon the sheeting.

11. Concrete 100mm thick is laid to bring the slab up to the finished floor level which is then float finished to give a smooth finish for tiling or carpet finish

12. The outer leaf of the wall is built. In this case, artificial stone to match the house is used

13. The inner leaf of the cavity wall is built to complete the basework. The same material as the outer leaf has been used to provide a feature stone finish

14. The PVCu external cill is fitted to the dwarf wall and erection of the side frames begins.

15. On completion of the frames the structural aluminium eaves beam is fitted to the head of the frames.

16. The PVCu thermally clad aluminium glazing bars and ridge system are quickly assembled.

17. The polycarbonate glazing panels are installed (alternatively, double glazed units may be specified).

18. The side frames are glazed after the roof is complete

19. The ventilated aluminium ridge is ready to accept the clip fit PVCu internal cladding. Electrical cables may be concealed behind the cladding if a fan or lights are required.

20. The PVCu internal fascia is clipped onto the eaves beam to complete the internal finishing trims. Other internal work IS completed once the roof is on

21. The completed conservatory

http://www.conservatoryliving.co.uk

Carl Russell



Georgian And Victorian Style Conservatories

Georgian Conservatories Georgian architecture was the style of the 18th... Read More

There Is Always Something To Improve Or Innovate For Comfort

In this fast moving world of the 21st century, we... Read More

How to Install a New Toilet in 5 Easy Steps

If your toilet is old and in need of repairs,... Read More

Three Great Concepts for Remodeling a Master Bedroom

Since it's one of the places people spend the most... Read More

How to Replace the Rollers on Your Patio Sliding Glass Glass Door

Hiring a professional to replace your rollers could cost you... Read More

Which Lamp Should I Choose?

With all the lighting choices out there, you may want... Read More

Use the FHA Mortgage Specifically Created for Home Improvement

Almost everyone knows about FHA mortgages. They are tailor-made for... Read More

Where Did We Get Clocks From Anyway?

A clock is simply a device that measures time. Typical... Read More

Cordless Impact Wrench - Not the Same Tool as Your Cordless Drill

The cordless impact wrench is quickly gaining in popularity among... Read More

Electric Radiant and Floor Coverings

If the decision of what type radiant heating system to... Read More

Using A Hardwood Floor Sander

Refinishing your hardwood floors yourself can be time consuming and... Read More

Beat the Summer Heat - What Size A/C Do I Need?

A larger air conditioner will not always provide more cooling.... Read More

How to Keep Your Tools Useful for Every Season

You don't want to keep your useless tools in your... Read More

Hiring a Waterproofing Contractor

According to the National Association of Waterproofing and Structural Repair... Read More

Choosing a Home Builder

So you've decided to build a new home. Like many... Read More

How To Completely Rehab Your Home In 10 Days!

This report is about taking a house and restoring it... Read More

Laminate Flooring - Cleaning & Maintenance

One of the biggest advantages of laminate floors is that... Read More

How To Choose The Canvas For Your Awning

The main factor for the canvas for your awning, it's... Read More

Ridding Your Home of Geopathic Stress

Just as there are solar magnetic stresses that come from... Read More

Pre-Fabricated Steel Buildings

More and more construction is being done with steel in... Read More

Basic Methods of Foundation Waterproofing

It is absolutely necessary to waterproof the foundation of your... Read More

Finishing Your Basement Can be Very Rewarding

Transforming your home's basement into a finished space can prove... Read More

Removing Old Aluminum Windows

This week we are going to talk about the process... Read More

Family Fun ? Is Swimming In A Safe Pool

Family fun is one of the most important things you... Read More

Tips For Breaking Away From White Wall Paint

Paint is one of the most affordable and easiest ways... Read More

If you'd like to keep up-to-date,
please complete the form below and we'll put you on the mailing list
to receive our twice-yearly newsletter for supporters

* Your email address:
* choes your language: